60 Second Seminar Session 8: Mud Management


Each brief educational session is designed to provide concise, interesting, informative insights on a variety of topics in just 60 seconds. You will be surprised at how much you can learn with only 60 seconds of your time!


Session 8:

Mud Management


Farm owners are constantly challenged by mud management. Not only does mud make it difficult to walk or ride machinery on, it can be harmful for horses. Mud can carry bacteria that can cause infection and disease as well as be a walking hazard, potentially causing injuries.


Using LSG Load Support Grid system on muddy problem areas, creates a permeable, solid, safe paddock.


PROBLEM:

Muddy, uneven surface








LSG Series® SOLUTION:

Provides smooth, firm surface









Long strips of HDPE (high density polyethylene) are ultrasonically welded at intervals of 14" to create a honeycomb-like structure of interconnected 3D cells. The cellular nature confines aggregates (earth, sand, gravel) to stabilize problematic areas around the farm.


PREVIEW OF CASE STUDY:


Before: After:

Muddy ingress/ LSG-3 expanded Infill Mix Solid, firm walking

egress in area area





CLICK HERE

to see the full case study.







These products are available through Cell-Tek Geosynthetics or your local dealer.

Please give us a ring 888-851-0051 or email info@celltekdirect.com.

We look forward to hearing from you!

www.celltekdirect.com

Maintain social distance.

Stay save and healthy, everyone!

© 2020 Cell-Tek Geosynthetics, LLC. 

809 Barkwood Court | Suite M | Linthicum, Maryland 21090 

info@celltekdirect.com | 410-721-4844

  • Grey Facebook Icon
  • Grey Twitter Icon
  • Grey YouTube Icon
  • Grey Pinterest Icon
  • Grey Instagram Icon